Cookies
We use cookies to give you the best possible experience on our website. You are free to manage this via your browser setting at any time or through the find out more link.
Close
Find out more
Cookie Portal
Manage and find out more about the cookies used on this website.
View Cookie Settings
Read Cookie Policy

Accept All Cookies and Close
Close Without Saving
< Back
This website has 4 types of cookies:
Your preferences will not take affect until the "save and close" button is clicked. To view our cookie policy please click here.
Strictly Necessary Cookies Used to help you move around the site and use its features. Without these cookies, it will be very hard to use the website.
Analytical/Performance Cookies Used to anonymously track visitors around the website so that we can improve your experience.
Functional Cookies Allows the website to remember your preferences and personalised your experience.
Targeted Marketing Cookies Allows adverts you see to be targeted to you and your interests.
Save and Close
< Back
< Back
Cookie Policy
< Back

A127 Warley Junction Improvements

Highway Schemes Homepage

Works Location

 
(Map Facing North)

 

Photos

Approach to the B186 Warley Street from the A127 Westbound

A127 Overbridge on B186 Warley Street

Slip Road from the A127 Westbound to the B186 Warley Street

About the scheme

The A127 London to Southend Arterial Road is a major strategic route between East London and Southend, also it provides one of the two main access routes into the southern part of the county, including Thurrock. As a result, the A127 corridor is heavily congested during peak periods and regularly experiences queueing at various locations along its length. With predicted housing and economic growth over the next 10 years and beyond, this will naturally lead to an increase in traffic on all roads in Essex. This includes more specifically the Basildon and Brentwood Areas that are served by the A127 corridor, which are currently subject to a large amount of growth, both commercial and residential expansion. The scheme is part of a range of measures to improve the A127 corridor.

The "A127 Warley Junction Improvements" scheme aims to improve and future proof the A127 / B186 Warley junction, and to provide improved additional capacity to accommodate the increases in traffic due to the industrial expansions both north and south of the junction. The scheme will also address the collision risk which has been highlighted due to evidence of road users experiencing poor visibility at the junction. 

The existing 40 mph speed limit will be extended through the junctions in a generally southerly direction to a point approximately 100m south of the junction with Church Lane as an additional means to help reduce collision risk. In order to achieve this, carriageway widening works will be undertaken in addition to installation of permanent traffic signals at both junctions; this will allow for additional lanes to be created on the B186 for the traffic wishing to turn right onto the A127.

The work will be undertaken in a phased approach over a period of approximately 18 months. Please be aware that some details will be subject to change as the design process for the project continues. The scheme drawings can be viewed at the bottom of this page.

 

Further Information

Updates will be available via this webpage including changes to the work programme, details regarding traffic arrangements as well as local signage.

For details about other roadworks in the area please visit: www.roadworks.org