Completed Maldon Schemes

The completed schemes have been archived for public interest and review.

Please select the relevant scheme from the options below.

A414 Maldon

A new crematorium is being constructed on the A414 on Maldon Road opposite St Margaret’s Church in Woodham Mortimer (situated on the A414 between Lodge Road and Rectory Lane). 

To support this work, an entrance is being constructed on the A414, with carriageway widening to the south to accommodate a new right turn lane into the site.

Information relating to Blackwater Retail Park developer scheme, Maldon

Arrangements have been made to reconstruct an Essex Highways’ structure on Butt Lane in Maldon. The retaining wall is located to the rear of the highway verge on the junction of Butt Lane and Downs Road. The wall, which is not visible from the highway, is in a deteriorating condition and has been leaning for a significant period. Regular monitoring of the structure has been carried out during this time.

It is our intention to remove and replace the structure with two smaller retaining walls, slightly narrowing the verge in the process. 

Information relating to works planned at Hoe Mill Bridge, Woodham Walter
Information relating to the carriageway improvements on Market Hill and Fullbridge Maldon, including bridge waterproofing works.
Information relating to Mundon Wash Bridge reconstruction works