Completed Braintree Schemes

The completed schemes have been archived for public interest and review.

Please select the relevant scheme from the menu.

Information regarding the A131 Braintree to Sudbury Route Improvements.
The Braintree Integrated Transport Package (ITP) is a package of schemes with the aim of improving access to Braintree Town Centre. In addition to a number of traffic management measures for Braintree Town Centre
Information relating to the strengthening of Catholic Bridge
Information relating to works to repair the retaining wall along Church Hill, White Notley
Information regarding road closure and reconstruction works associated with Courtaulds Culvert located under Bovingdon Road, Bocking near Braintree
p>Repair works are due to take place on Chipping Hill Bridge on Powers Hall End in Witham from Monday 26 September 2022.

Cust Hall Bridge is located on Gainsford End Road, Toppesfield, Braintree and carries a two way, single road over a tributary of the River Colne. An assessment of the structure has found the bridge to be in a weak condition and needs to be replaced.
Information relating to Great Bardfield
Information relating to works to replace the bridge deck at Hoppit Bridge, Braintree
Information relating to traffic renewal in Witham on Newland Street / Collingwood Road / Maldon Road
Railway Street, Braintree - traffic signal renewal
Information relating to developer scheme to improve the junction at Rayne Road, Braintree
Information relating to erosion protection works at Sculpins Bridge
Information relating to works to improve the retaining wall on Sudbury Road, Gestingthorpe
Information regarding the bridge deck replacement at White Hart Bridge, Poole Street, Great Yeldham