The A127 / A130 Fairglen Interchange is a crucial link in our region’s road network for South Essex and is of vital importance to our sustained economic growth.
The Interchange has served us well for many years but has reached its capacity and is in need of significant improvement.
A proposed 'short-term' scheme has been developed to increase the capacity of the A127 / A130 Fairglen Interchange, reduce journey times, address existing safety concerns and improve pedestrian and cycling connectivity.
The scheme, which has been developed following feedback from road users and local people, will allow the interchange to handle current and estimated future traffic levels, enabling and supporting economic growth across South Essex.
Planning consent for the scheme was granted in December 2019. The Compulsory Purchase Order and Side Roads Order were confirmed on 25th July 2023.
A construction start date for the main works will be announced once a contractor has been appointed.
The A127 / A130 Fairglen Interchange lies at a key point on the transport network in South Essex, forming a strategic connection between the A13, A127, A130 and A1245. The Interchange currently experiences high levels of congestion during peak periods and high volumes of traffic at other times too.
There are also safety concerns, with significant numbers of collisions involving motor vehicles, which have been attributed to poor sightlines for drivers at some locations and to incorrect lane use.
As well as current traffic congestion and safety concerns, the Interchange is expected to come under increased pressure in future as plans for significant growth in housing and jobs is realised.
It is estimated that over 62,000 jobs will be created in South Essex by 2037, and that over 3,400 new homes per year will be needed to accommodate this new workforce.
Having considered and investigated various potential options, we have now agreed a scheme to improve the A127 / A130 Fairglen Interchange. The scheme includes:
The development of the scheme was informed by a series of engagement and consultation events which the public and key stakeholders were invited to participate in.
In February 2017, we published information about our plans to improve the A127 / A130 Fairglen Interchange and provided opportunities for people to find out more about the project and give us their feedback.
In April/March 2018, we then held a six-week public consultation on proposed changes to the A127 / A130 Fairglen Interchange, with responses analysed and considered to help us finalise design of the scheme. Our public consultation brochure and report can be found in the documents section below.
When we publicised information about proposed A127 / A130 Fairglen Interchange improvements in February 2017, we also published a long-term option.
The long-term option could be required in the event of increased traffic as a result of higher levels of future growth but would require significant additional funding.
The short-term solution is fully compatible with the long-term option should that need to be implemented in the future.
Design of the long-term solution has not been fully developed, but an overview can be seen below.
Copyright information Maps above are reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office © Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings.100019602. 2017 Limitation: The drawings above have been prepared by Jacobs on behalf of Essex County Council for the exclusive use of Jacobs’ Client, and are subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsover for, or in respect of, any use or reliance upon, this drawing by any third party. © Copyright 2018 Jacobs UK Ltd. The concepts and information contained above are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright
The following documents relate to the purchase of land required to undertake the scheme.
Fairglen Interchange - Confirmed SRO plans - PDF (9.8MB)
Fairglen Interchange - Confirmed CPO plans - PDF (7.8MB)
Fairglen Interchange - Confirmed SRO - PDF (288KB)
Fairglen Interchange - Confirmed CPO - PDF (2.5MB)
Fairglen Interchange - Confirmed SRO notice - PDF (68KB)
Fairglen Interchange - Statement of Reasons - PDF(173.6KB)
Fairglen Interchange - Scheme Plan - PDF(4.4MB)
Fairglen Interchange - CPO Schedule - PDF(1.3MB)
Fairglen Interchange - CPO Plans - PDF(7.6MB)
Fairglen Interchange - CPO Notice - PDF(89.0KB)
Fairglen Interchange - SRO Schedule - PDF(152.1KB)
Fairglen Interchange - SRO Plans - PDF(9.6MB)
Fairglen Interchange - SRO Notice - PDF(63.5KB)
A127 / A130 Fairglen Consultation Brochure - PDF(5.2MB)
Fairglen Interchange Consultation Report 2018 - PDF(1.5MB)
A127 Corridor for Growth: An Economic Plan - PDF(2.2MB)
Modal body text goes here.