Welcome to the Highways Service Information Centre
The Vehicle Crossing Process is a 2 stage process where the resident applies for consent for their Vehicle Crossing and their chosen Contractor completes the second stage which books the road space and checks the construction of the new Vehicle Crossing.
A vehicle crossing, or dropped kerb, is when a kerb is lowered and the footpath strengthened, to let vehicles move between roads and properties.
The Initial Vehicle Crossing application costs £. The fee is non-refundable and covers a site visit, a search of underground apparatus (i.e. gas, electric) and administration processes.
If your application is approved an Application to Implement by Road Opening Notice costs £ and is payable by your chosen contractor.
The vehicle crossing (dropped kerb) fees are non-Vatable.
You will need:
Once an application is approved works must be completed within six months. If works have not been completed within six months a new application needs to be made. Please see Question and Answer number 26 for more information.
Along with reading the terms and conditions and construction specifications, please also refer to important information contained in the questions and answers below, (these can be printed for your own records).
Select a question to reveal/hide the answer:
Skip Q&A section
Once we have received your completed application(s), we will process your payment and arrange for an inspector to visit the proposed site. The inspector will carry out all the necessary checks against the criteria, and a decision will be made to either grant preliminary consent for the vehicle crossing, or to decline the application.
Once the Vehicle Crossing has been given consent, you will also be sent the information on the Statutory Undertakers that are affected (gas, electric). You will need to pass this onto your contractor and they need to contact us via the website to book the road space. It is illegal to work on the highway without the permit being in place and they are liable to fines.
Vehicle crossing applications can be declined for a number of reasons, for example: - Proposed site does not meet the criteria - Insufficient frontage at proposed site - Poor visibility - Proximity to existing street furniture (i.e. street lights, bus stops etc.) We will contact you to explain our reasons for declining an application.
In 2009 the criteria by which we grant permission for vehicle crossings changed. Unless your application meets the current criteria requirements we cannot grant permission for a vehicle crossing.
You can, providing your vehicle crossing’s dropped distance is no wider than 4.5 metres (5 kerb lengths) and meets all the other requirements.
Both you and your neighbour will need to apply for a new vehicle crossing separately online using the link above. Both of you will need to answer yes on the question stating, ‘Is this application for one property?’ Where permitting, the inspector will approve for a shared access following site attendance.
Please contact our Development Management Team in the first instance – Development.Management@essexhighways.org, who will guide you through the process to follow.
There are two ways to progress request for repair to damaged vehicle access.
The first way is to report your vehicle crossing surface defect using our online reporting system
Alternatively, if you wish to pay to have the vehicle crossing fixed yourself, you can complete your request using the online vehicle crossing application process via the link above. If you choose this option, please complete your application the same way you would do for a new vehicle crossing and add your repair details in the notes section.
Providing your application has been granted preliminary consent, the process can take several weeks to complete.
Essex County Council will need to obtain full details of any street apparatus and utilities in the proposed vehicle crossing location; this is known as a ‘Stats Request’. Your application will be on hold until we’ve received this information, and we will provide you with an estimated timescale for how long your application is likely to take. Once this stage is complete, you will receive a copy of the Stats along with additional information for you to pass on to your contractor. Your contractor will then liaise with us to agree the start date.
On occasions there will be certain conditions that must be met by both you as the applicant and your chosen contractor. One of our inspectors will attend site following completion of the works to ensure these conditions have been met.
Any work within or affecting the highway is to be agreed by Essex County Council, the Highway Authority, as we are responsible for the maintenance of the highway.
No, our minimum parking space dimensions (5 metres perpendicular depth by 2.5 metres width) are to accommodate for all types of vehicles up to the size of a large van. We understand your current vehicle would fit in your proposed parking area however this may not be large enough for any future vehicles you may obtain or for any future owner’s vehicles.
No, however you need to seek permission from the land owner of the road.
The number of kerbs are calculated from the property boundary so if the neighbour has more this would not prevent an extension on your side.
No, this is not a safe manoeuvre to enter and exit across the highway. We only encourage a vehicle to enter or exit their private drive at right angles, ±10 degrees tolerance, with the highway.
Yes, our vehicle crossing application is for granting you permission to move a vehicle across a highway verge or footway under the Highway Authority’s powers stated in Section 184 of the Highways Act 1980.
Providing your vehicle crossing does not conflict with any physical features such as a bus shelter, pole and/ or the high raised (Kassel) kerbs where a passenger would enter a bus and meets the rest of our criteria then this would not be an issue.
This will depend on the decision of the local tree officer, who shall be consulted during the initial inspection process of your application, which is once the application fee has been submitted. We are unable to process without the application fee as a site inspection is required.
These applications will take longer to process.
Please be aware if we can find no way of accommodating a vehicle crossing without it having a detrimental impact on a mature or important tree then permission for the vehicle crossing may be declined.
This will depend on the decision of the Street Lighting Team, who shall be consulted during the initial inspection process of your application. We are unable to process without the application fee as a site inspection is required.
This should not affect our decision on whether you have a vehicle crossing however please be aware a motorist will be able to park in the parking bay legally. You can apply to remove the parking bay under our Traffic Regulation Order process, which will require an additional fee and costs to complete the removal works. However, as this procedure goes through a consultation process there is no guarantee the parking bay can be removed.
There is no clear answer to this question. An application would need to be made first, so we can review the application and carry out a risk assessment on a case by case basis. The outcome of the risk assessment would determine whether a vehicle crossing is achievable and if so the best position.
Yes, providing the gate is 6 metres from the edge of the highway in order to prevent a vehicle from stopping in the highway to open the gates.
This shall be determined on a case by case basis once the application fee has been submitted to carry out a site inspection by the inspector.
This shall be determined on a case by case basis.
By using the online form via link above, to complete the questions as if you were applying for a new vehicle crossing and add the mobility vehicle or motorbike details in the notes section. Please be aware, we will only allow to have no more than 1.8 metres of dropped distance for this type of access.
As part of the initial inspection process, our inspector may decide that a vehicle crossing can be approved with some minor changes to the original request, for example, a reduced number of flat kerbs. The approved layout and design of the crossing will be detailed in our communication with you.
You may choose any contractor to undertake the work as long as they are suitably qualified. A list of the requirements can be found below. You will need to obtain this information from your contractor and forward to us for checking before we can allow them to work on the highway. We reserve the right to refuse contractors from working on the highway if we feel they are not competent. A contractor can be found using a number of sources including an internet search, your own knowledge or word of mouth.
Contractor Requirements:
Valid £10 million public liability insurance.
All site workers to be NRSWA* accredited to Operative level with at least one of the gang accredited to Supervisor level either based permanently on site or available to visit site at any time. (*New Roads and Street Works Act 1991)
All contractors staff working on site must adhere to the prescribed PPE requirements.
You have six months from the date of approval to complete the crossing. After this time, you would need to apply again under a new application. If you have any queries on this please contact highways.notices@essexhighways.org.
If you are unhappy with the quality of work undertaken by your chosen contractor, you will need to discuss this with them directly.
A few weeks after the work is completed, one of our inspectors will attend the site to ensure that the vehicle crossing meets the specification and conditional requirements. If the inspector finds that the vehicle crossing does not comply with the specification/conditions set out in our approval, we will contact both you and your contractor. It is your contractor’s responsibility to rectify any defects which are highlighted, and further checks will be carried out to ensure this has been completed.
There may be other options available if you have significant difficulties with your mobility and daily routines and feel you may benefit from a Social Care assessment.
If your query is related to a disabled adult please contact our Adult Social Care Team on 0345 603 7630 or if this is related to a disabled child please contact our Families and Children’s Social Care Team on 0345 603 7627 for further information.
There is no change to the criteria for owners of electric vehicles (EV). We understand there may be issues with charging and accessing a charging point, but we need to balance needs of EV owners with the safety of other road and pavement users accessing the carriageway and footway.
Documents must be uploaded with your application so it may useful to save these on your computer prior to applying.
Apply for Initial Consent
Contractors apply to implement using the Road Space Booking Form below
Vehicle Crossing Road Space Booking Form - DOCX(123.5KB)
Modal body text goes here.