Welcome to the Highways Service Information Centre
As part of planning conditions for the development of properties on land to the east of Parsonage Road in Takeley (UTT/19/0394/OP and UTT/22/0152/DFO), improvements to the local highway are required. This includes the construction of a new roundabout to serve the new development of 110 dwellings to the west, as well as a new care home to the east.
A 3.5m wide shared cycleway link and parallel crossing designed to support pedestrians and cyclists will also be created. New street lighting will be installed, drainage works will take place and the existing 30mph speed limit will be extended to just north of the A120 bridge.
These works will be carried out by Stonebond Properties (Chelmsford) Ltd and their contractors Euro-City Group.
Following a delayed start, the works began on 6 July 2023. These are being carried out in phases and will take approximately 12 weeks. During this time traffic management will be adjusted to reflect the different activities that are planned.
Please note that advertised dates may be subject to change if the programme is affected by poor weather or if unexpected issues arise.
Phase 1:
6 July to 15 September 2023
Temporary two way traffic signals will be operational 24 hours a day on Parsonage Road.
The signals will be manually controlled during the peak hours (7am to 7pm).
Phase 2: Road closure - 24 hours a day
25 to 29 September 2023
A full time closure of Parsonage Road will be in place 24 hours a day. Appropriate diversions will be in place. This closure is required to accommodate surfacing works for the safety of the public and workforce.
Refer to One.Network for details.
Traffic management will be reviewed and adjusted where necessary according to the works being undertaken and dates may be subject to change.
Drivers are recommended to take additional care when driving through the area.
The developer has indicated they will be working between the hours of 8am and 6pm Monday to Friday and between 8am and 1pm on Saturdays.
Please note that the programme may be subject to change as the works progress.
The developer will be responsible for informing local residents and businesses of key information and changes as they arise. Details will be reflected on this webpage when arrangements have been confirmed.
For details about other roadworks in the area please visit: One.Network and the @essexhighways twitter feed.
If you have questions in advance of the works, please contact:
Parsonage Road, Takeley - General Arrangement Plan - PDF(1.1MB)
Parsonage Road, Takeley - Resident letter - PDF(262.8KB)
Modal body text goes here.