×

Mundon Wash Bridge – replanting works


30/04/2020
Latest News
Latest news on works at Mundon Wash Bridge

Read more

Mundon Wash Bridge, Mundon Road, Mundon, Maldon

[FEATURED_NEWS]

Works Location


Photos

Above: View of the carriageway from the south 



Above: West elevation of the existing concrete box culverts

Above: West elevation of the concrete pipe structure


About the scheme

Mundon Wash Bridge carries Mundon Road over the Mundon Wash waterway in Mundon, Maldon.

The bridge dated back to the 1940s and consisted of three sections, two reinforced concrete box structures and a concrete pipe that run under the carriageway.  An assessment of the structure found the structure to be in a weak condition and required replacing. 

Bridge replacement works have taken place with the support of a full road closure to allow the original structure to be removed and replaced with a combination of two precast concrete box sections which have been placed side by side, along with headwalls and wingwalls that comply with national standards.


The Works 

Mundon Road was closed at the bridge to allow construction work to begin.  The road reopened in December 2019 however some remedial works remain.  These are planned for March 2020 with the support of temporary traffic lights.  

These works are anticipated to start 16 March and take approximately four weeks to complete, after which road patching activities are planned to repair identified defects on Blind Lane, Mundon. 

 

Blind Lane - road closure for road patching works:

Following completion of the outstanding works to Mundon Wash Bridge, road patching activities are planned to repair identified defects on Blind Lane in Mundon.  These works are anticipated to take approximately two weeks to complete from Monday 13 April 2020 with the support a road closure due to the restricted road width.  

  • Week commencing 13 April: Blind Lane will be fully closed 24 hours a day (no through traffic).  
  • Week commencing 20 April: A full road closure (no through traffic) will continue to be necessary on Blind Lane to carry out remaining patching works however in order to accommodate local businesses on Blind Lane, we anticipate limiting these closures times to daytime, off peak hours only.  

Access to properties on Blind Lane during closure periods will continue to be maintained either from Fambridge Road or Mundon Road, depending on the location of the repairs. Advance signage will be in place to advertise the road closure with appropriate diversions in place.

We are contacting businesses on Blind Lane separately to advise them of our plans and to minimise disruption as much as reasonably practicable.

Updates relating to the traffic management plans will be updated to this webpage as the works progress.

We appreciate that these works may cause temporary inconvenience, and would like to apologise for this.  

Please note that the work programme may be subject to change if the works are affected by poor weather or if unexpected issues arise.

Thank you in advance for your patience and co-operation while we undertake these necessary works. 


Further information

The work programme may be subject to change if works are affected by poor weather or if unexpected issues arise.

The latest information and updates about these works, including changes to traffic management will be updated to this webpage and reflected on site signage. 

For details about other roadworks in the area please visit: One.Network

Documents

[FEATURED_DOCS3]